Management of durostone fixtures
Acceptance → storage → storage → use → return to storage
I. Acceptance of synthetic stone fixtures
1. Check whether the synthetic stone fixture is posted “synthetic stone fixture technical parameters table”.
2. Synthetic stone fixture bracket should be firm, to meet the requirements of use.
3. When testing the first synthetic stone fixture, by the operator in the test machine to check the synthetic stone fixture is not a probe short-circuit, disconnection; synthetic stone fixture to do the opposite of their respective test probes are not crushing the PCB board; check the “synthetic stone fixture Technical Parameters Table” is not the same as the total number of points, such as the number of open circuit, the number of short circuits, and so on.
4. If the test is qualified by the operator to fill in the quality records, in the synthesized stone jig to do marking.
5. If the synthetic stone fixtures in the inspection failed, such as short circuit, broken some problems, the operator should be responsible for the disposal, and fill in the unqualified notification form back to the fixture production team to facilitate the improvement of processing.
II. Synthesized stone fixtures into the warehouse
1. composite synthetic stone jig should be placed on the jig probe with a soft cushion, so that the upper and lower synthetic stone jig probe will not be damaged, and use a plastic bag to completely cover the synthetic stone jig.
2. The new synthetic stone jig (including the change of the synthetic stone jig) should fill in the “synthetic stone jig receiving record form”.
3. After the use of the synthetic stone jig, the operator should be responsible for the immediate return to the position, and with the synthetic stone jig administrator to do the appropriate handover procedures, and register the number of tests and the status of the synthetic stone jig.
4. The new synthetic stone fixture should be placed in the corresponding empty space in the fixture library, generally the same customer, the same page or a unified account; and placed in the same level of the fixture library in the same or adjacent empty space, easy to retrieve.
5. The original synthetic stone jig against the account book should be placed in the corresponding number of the location.
6. double-sided synthetic stone jig in the jig inventory, the upper and lower jig to be placed horizontally, and composite together.
7. Single-sided synthetic stone jig in the jig storage is required to be placed vertically.
Three. Synthesized stone jig storage
1. Need to control the temperature and humidity of the synthetic stone fixture library in a certain technical parameters, temperature control ≤ 35 ℃, 75% RH, is strictly prohibited direct sunlight.
2. Synthetic stone fixtures placed between the cabinet and the cabinet, that is, the width of the aisle should be favorable to take fixtures, but also to maintain the specifications of the fixtures 100mm.
3. The width, length and height of each compartment of the placing cabinet should be designed in accordance with the distance between the width, length and height of the fixtures.
4. For each fixture placed in the cabinet, different levels, fixtures placed on the location of the corresponding code.
5. The code on the jig and place the cabinet on the code is consistent, in storage can be placed directly in the original position.
6. The storage of jigs must be neat, smooth and labeled.
7. Change or cancel the customer should be timely clean up its use of fixtures, from the accounts on the cancellation, and the fixtures will be handed over to the fixtures warehouse administrator for recycling and disposal.
IV. Synthetic stone fixtures for use
1. Fixture management personnel should be based on the instructions of the production process card, the customer, model, and related changes to verify the issuance, check the “fixtures using the account book” for registration, and take out the fixtures in the corresponding fixtures stored in the location of the fixtures.
2. When removing the fixtures should be slightly removed from the side of the fixtures, along the direction of the fixtures placed straight out, such as the top of the fixtures, should be lifted up to take out the top of the fixtures, and then take out the fixtures underneath, the two fixtures should be avoided to avoid collision, to prevent damage to the probe.
3. Carefully remove the plastic bag on the fixture, fold the plastic bag and put it back to the corresponding fixture placement.
4. The operator should mark the date of return and the quantity of use on the “Fixture Record Sheet” after use, and the administrator should verify the inspection and file it for preservation.